Minnesota DNR Comments to the USACE re: Fargo Moorhead Dam and Diversion
The locally preferred plan includes a water control structure that is classified as a high hazard dam, which requires preparation of Minnesota State EIS. As part of State EIS scoping, additional assessment and review will be necessary to demonstrate that the above mentioned criteria are fulfilled.
Continue Reading