Mark and Barb Askegaard Comments to the USACE re: Fargo Moorhead Dam and Diversion
Your latest EIS does not adequately address the issue of BASIN-WIDE flood risk management as a tool which needs to be incorporated into the plan. The locally preferred plan is all about protecting a “future” Fargo and the land which Fargo wants to develop-it is not about providing flood protection for current Fargo-Moorhead which the much more economical Federally Preferred Plan accomplishes. Adequate analysis of impacted areas upstream from the water staging have also not been addressed sufficiently and their appropriate costs have not been stated.